m36_i_a_2b_i_92_7_005

OverviewTranscribeVersionsHelp

Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

5 revisions
gettingandspending at Aug 05, 2022 12:12 PM

m36_i_a_2b_i_92_7_005

{Top centre: "5"}
train wound down the valley
from side to side and in
one place looped around a hill
going under itself if it were
82 cars long. There were 18
tunnels we went through which
weren't wso bad wntil after a
frieght train passed us one
the way up, and you could
feel the heat it had caused
in the tunnel going through.
We got dirtier and dirtier
but it was cooler out there
and great fun as we were
joggled? about like dice in
a shaker.

m36_i_a_2b_i_92_7_005

train wound down the valley
from side to side and in
one place looped around a hill
going under itself if it were
82 cars long. There were 18
tunnels we went through which
weren't wso bad wntil after a
frieght train passed us one
the way up, and you could
feel the heat it had caused
in the tunnel going through.
We got dirtier and dirtier
but it was cooler out there
and great fun as we were
joggled? about like dice in
a shaker.